Frank Turner Court Using a ground source heat pump system to provide space heating and hot water to 8 high end properties

 
telephone +44 (0)1223 941070
   

Frank Turner Court Using a ground source heat pump system to provide space heating and hot water to 8 high end properties

geothermal heating and cooling systems

 

 
 
 

Latest

 

This case study details the G-Core Limited team's involvement in the £2.6 million project to deliver a district Ground Source Heat Pump system (GSHP) to the Frank Turner Court development in Swaffam Bulbeck.

The Client/Developer's ambition was to utilise ground source heating to provide space heating and hot water to 8 high end properties and provide their purchasers with the opportunity to be independent of fuel oil and natural gas and to gain the benefits of the Governments Renewable Heat Incentive.

Objective

The Clients objective was to move away from the existing variable fuel sources (LPG, direct electric and fuel oil), to provide the residents with a reliable efficient and in-obtrusive renewable technology and for them to gain the benefit of the Governments Renewable Heat Inventive.

Owner of the developer Eversden Construction:

“The Ground Source Heat Pump system is relatively low maintenance and can be controlled remotely.  It is quite rural here, but in the mornings, all we could her were boilers starting up.  The pump is quiet and you don’t get the lorries coming to deliver oil, plus there are the fuel savings for the residents.  We expect is to be a great selling point”.

Renewable energy is definitely the future and makes complete sense.  Who wouldn’t want more security over fuel prices?”

The system consisted of a Ground Energy Collector (32x70m deep borehole heat exchangers) coupled to a multiple ground source heat pump system, each providing heat and domestic hot water to individual properties.
The system was design, installed and commissioned and is also maintained by G-Core Limited.


Finance

Grant

None

Incentives

None

£ savings per year

13.42k

CO2 savings

BREAM

NA

CO2 t/ year

58

 

Sector

Location

Swaffam Bulbeck

Client

Eversden Construction

Sector

High End Domestic

Duration

12 months

Completion date

January 2013

Technology

Borehole Energy Collector

32 x 70m. 40mm BHEs

Heat Pump Type

Dimplex SI Series

Ancillary Plant

None

Peak Heating (kW)

71

Peak Cooling (kW)

NA

Peak Simultaneous (kW)

NA

Annual Heating (kWh)

127,800

Annual DHW (kWh)

21,300

Energy Efficiency Rating

NA

Coefficient of Performance

4.2

Seasonal Performance Fact

4.6

 

G-Core Limited

Unit 4b, Church Meadows
Haslingfield Road
Barrington
Cambridge
CB22 7RG
United Kingdom

Telephone +44 (0)1223 941 070
Email info@gcore.co.uk

Copyright ©2024 G-Core Limited. All rights reserved. Registered in England and Wales, company no: 08835345